Babhali barrage is well within the provisions of “gwdt”.
Storage of babhali barrage is only 2.74tmc.
Total storage of babhali barrage is within the river banks.
Total storage is against the gates only.
Babhali is not a dam, it’s a barrage
“The Babhali barrage under construction by Maharashtra since Jan- 2005, is at present built upto the sill leveal of 327.00 meter (Bed level of river is 326.00 meter) and only partially to the length of about 100 meters out of the total length of 240 meters.”